Healesville Koo Wee Rup Rd Upgrade

Forming and pouring culverts and fauna crossings as part of a road duplication project, ensuring efficient water flow and safe wildlife passage. This critical infrastructure work highlights our dedication to sustainability and precise engineering. A total of 40 significant culvert crossings have necessitated the following (please consider these figures as approximate):
- 951 precast culverts
- 664 tons of steel (for base slabs)
- 6,287 cubic meters of concrete (including base slabs and blinding)
- 316 hours of crane operation (for unit installation)

Coolstore Rd Level Crossing Removal 

The Civil & FRP package encompasses the station footing works, which includes earthworks, ground stabilization, and the supply and procurement of all necessary materials to complete the project. Our works included constructing foundations for multiple buildings, parkiteer, and waste enclosure, along with four lift pits, four stair foundations and platform infill decks, and a generator slab.

Expansion Joint & PIT REPAIR Works 

Repairing expansion joints & drainage pits on bridges, ensuring their durability, structural integrity & proper water management preventing structural damage. This vital maintenance work helps to safeguard the bridges integrity and extend its lifespan.

Bonnie Brook Road Bridge

Constructing a new bridge, meticulously forming and pouring concrete to ensure its structural integrity and longevity. This project highlights our commitment to high-quality craftsmanship and robust infrastructure development. The design and construction were carefully planned to avoid disturbing the Growling Grass Frog which is found in the Kororoit Creek below.